Heat & Industrial Decarbonisation Project of the Year

Winner:

wienerberger UK & Ireland

Novel Heat Recovery at Warnham Brickworks

wienerberger UK & Ireland won edie’s Heat & Industrial Decarbonisation Project of the Year Award for a novel heat recovery project at its Warnham brickworks, which captures waste heat and water from brick dryer exhausts, upgrades the heat using industrial heat pumps running on renewable electricity, and returns both to the manufacturing process.

The challenge

At Warnham, seven dryers were exhausting warm, moisture-laden air to atmosphere, wasting low-grade heat and water. The site was selected to pilot the technology because it combined four conditions that maximised decarbonisation potential: high gas consumption, high product moisture content, inefficient chamber dryers and continuous production.

Although heat pumps are a known technology, implementing them at industrial scale with a higher temperature uplift, large airflows and a harsh operating environment is still new. The system also had to be installed while the factory kept running.

The solution

The £4.5m IETF-backed scheme replaces part of a fossil-fuelled drying process with electric heat pumps powered by renewable electricity, while improving resource efficiency through water recovery and reuse. The concept design was developed by wienerberger’s European colleagues, as this is the only suitable technology to recover energy from the wet air.

Clear targets were set from the outset: reduce dryer gas consumption by 83%, cut carbon emissions by c.3,700 tonnes a year, recycle 2 tonnes of water an hour, and prove a model that could be replicated elsewhere. The project supports wienerberger’s strategy to reduce Scope 1 and 2 emissions by 42% by 2030 against a 2020 baseline, on a pathway to net-zero before 2050.

How the project works

The solution captures humid exhaust air from the dryers and condenses it through a recovery system, before high-temperature heat pumps lift its temperature to up to 90°C and feed it back into the drying chambers through heat exchangers. The condensate water is returned for use in clay preparation.

The project was delivered with technology partners Heatcatcher (design and engineering) and Seward (which supplied the Sabroe heat pumps), alongside wienerberger’s internal engineers and project managers. Work was phased chamber by chamber to minimise disruption to production, and included new civils for the heat pump and condensate equipment, structural modifications to dryer chambers and ducting, an upsized electrical feed, a new transformer and modernised dryer controls. The project was completed on budget, just three months behind schedule due to poor weather delaying civils work. It is the first time this integrated approach has been applied in the UK brick industry.

The results

The project is on track to deliver its carbon target, equivalent to a 16% reduction in the factory’s annual carbon emissions. Dryer gas use has fallen by an average of 60% so far, with some drying cycles achieving zero gas consumption, and further optimisation will help achieve the planned gas saving.

The project is on target to reduce dryer gas consumption by 18,125MWh, shifting this to 2,499MWh of renewable electricity. This reduces the factory’s gas Specific Energy Consumption by 125kWh per tonne of bricks and increases resilience to gas price volatility.

Water recovery has enabled a 1,740,000-litre mains water saving so far, with an estimated 3.5 million litres saved in a full year – crucial in a region of high water stress. Improved airflow in the drying chambers has improved dryer consistency and product quality, reducing wastage, while lower manufacturing emissions cut the embodied carbon of wienerberger’s products. Work continues to optimise water quality, gas burner control and maintenance routines, and the site now provides an operational reference point for future roll-out across wienerberger.

At a glance

Who: wienerberger UK & Ireland

What: Novel heat recovery at Warnham brickworks

Where: UK

Why: To create a practical route to lower Scope 1 emissions in a hard-to-abate manufacturing process

When: 2024-25

Runners up

Erda Energy

Turning GSHP into Geo-exchange

Erda Energy has reconfigured a ground source heat pump installation at Oxford Brookes University's Headington campus into a geo-exchange system, using the same 14 deep boreholes to raise output from 1.2GWh to over 3.5GWh a year by adding heat pumps and integrated cooling. Surplus heat drawn off during cooling is stored underground rather than rejected, creating a seasonal thermal store. Space constraints on the campus had ruled out conventional alternatives. Gas consumption has fallen 53%, from 7.5GWh to 3.5GWh a year, contributing to a 63% cut in Scope 1 and 2 emissions against a 2010 baseline.

Haydale

JustHeat

JustHeat is a low-voltage electric underfloor heating system developed by Haydale after more than a decade of graphene research in South Wales. Graphene conducts heat quickly and efficiently, and the product is supplied as a thin, flexible film running at 48V, allowing installation in existing buildings without the disruption of a wet heating system. Independent testing recorded warm-up from 22C to 30C in around 75 seconds and up to 39% lower energy use than conventional electric underfloor heating, with room-by-room control. Haydale states emissions can fall by up to 90% where renewable electricity powers the system.

HEINEKEN UK

Manchester Brewery Heat Pump Project

HEINEKEN UK has retrofitted a centralised heat pump system at its Manchester brewery, which opened in 1875, capturing waste heat from refrigeration plant and redistributing it through a new site-wide hot water network. The £28.2m investment included £3.7m from the Government's Industrial Energy Transformation Fund. Fitting the network around existing infrastructure while brewing continued was the central challenge. A 12 to 18-month optimisation phase is now under way.

HotGreen & Coca-Cola Europacific Partners

Mölln pilot

HotGreen and Coca-Cola Europacific Partners are preparing a pilot to replace fossil-fuelled steam generation at a beverage production site with a high-temperature heat pump delivering steam at up to around 120C. Conventional heat pumps cannot reach these temperatures, which is one reason industrial process heat remains hard to abate. A roughly 50kW thermal unit will run in hybrid mode alongside existing boilers on a clean-in-place cleaning process, chosen for its intermittent demand and low operational risk. Installation is targeted from late 2026, with modelling indicating around 30% lower energy costs and larger 500kW modules envisaged subsequently.

Sovereign Network Group

High Temperature Heat Pumps for Social Housing

Sovereign Network Group, with Mitsubishi Electric and Samsung, is testing high and medium temperature R290 air source heat pumps in occupied low-rise social housing, where conventional low-temperature units usually demand new radiators, new pipework and several days of intrusive work. Running flow temperatures of 55C to 75C allows existing emitters to stay in place. Across pilots covering 125 homes, 29 have received high-temperature units so far. Installations took two to three days rather than five to seven, retaining all radiators and 95% of pipework, with capital savings of £3,500 to £4,000 per home.

UK Power Networks

SHIELD (Smart Heat and Intelligent Energy in Low-Income Districts)

SHIELD captures waste heat from computing to warm social housing, installing HeatHubs – small in-home data centres – so heat generated by processing is recovered rather than vented. Delivered by a consortium including UK Power Networks, Thermify, Power Circle Projects and Essex County Council, the current phase is deploying 300 systems across East and South East England alongside rooftop solar and battery storage. An energy services company model removes upfront costs, with households paying a fixed £5.60 a month for heating. UK Power Networks reports household carbon reductions of over 90% and electricity bill savings of around 30%.